
Time bar (total: 2.3s)
| 1× | search |
| Probability | Valid | Unknown | Precondition | Infinite | Domain | Can't | Iter |
|---|---|---|---|---|---|---|---|
| 0% | 0% | 0.1% | 99.9% | 0% | 0% | 0% | 0 |
| 0% | 0% | 0.1% | 99.9% | 0% | 0% | 0% | 1 |
| 0% | 0% | 0.1% | 99.9% | 0% | 0% | 0% | 2 |
| 25% | 0% | 0.1% | 99.9% | 0% | 0% | 0% | 3 |
| 25% | 0% | 0.1% | 99.9% | 0% | 0% | 0% | 4 |
| 37.5% | 0% | 0.1% | 99.9% | 0% | 0% | 0% | 5 |
| 56.2% | 0.1% | 0% | 99.9% | 0% | 0% | 0% | 6 |
| 56.2% | 0.1% | 0% | 99.9% | 0% | 0% | 0% | 7 |
| 65.6% | 0.1% | 0% | 99.9% | 0% | 0% | 0% | 8 |
| 76.6% | 0.1% | 0% | 99.9% | 0% | 0% | 0% | 9 |
| 76.6% | 0.1% | 0% | 99.9% | 0% | 0% | 0% | 10 |
| 82% | 0.1% | 0% | 99.9% | 0% | 0% | 0% | 11 |
| 87.9% | 0.1% | 0% | 99.9% | 0% | 0% | 0% | 12 |
Compiled 31 to 21 computations (32.3% saved)
| 458.0ms | 8 193× | 0 | valid |
| 5.0ms | 63× | 1 | valid |
ival-sub: 71.0ms (35% of total)ival-mult: 52.0ms (25.6% of total)ival-add: 43.0ms (21.2% of total)const: 17.0ms (8.4% of total)exact: 8.0ms (3.9% of total)ival-<=: 4.0ms (2% of total)adjust: 3.0ms (1.5% of total)ival-and: 3.0ms (1.5% of total)ival-assert: 2.0ms (1% of total)| Ground Truth | Overpredictions | Example | Underpredictions | Example | Subexpression |
|---|---|---|---|---|---|
| 0 | 0 | - | 0 | - | #s(literal 1 binary32) |
| 0 | 0 | - | 0 | - | (*.f32 ux maxCos) |
| 0 | 0 | - | 0 | - | maxCos |
| 0 | 0 | - | 0 | - | ux |
| 0 | 0 | - | 0 | - | (+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
| 0 | 0 | - | 0 | - | (-.f32 #s(literal 1 binary32) ux) |
| Predicted + | Predicted - | |
|---|---|---|
| + | 0 | 0 |
| - | 0 | 256 |
| Predicted + | Predicted Maybe | Predicted - | |
|---|---|---|---|
| + | 0 | 0 | 0 |
| - | 0 | 0 | 256 |
| number | freq |
|---|---|
| 0 | 256 |
| Predicted + | Predicted Maybe | Predicted - | |
|---|---|---|---|
| + | 0 | 0 | 0 |
| - | 0 | 0 | 1 |
| 25.0ms | 508× | 0 | valid |
| 0.0ms | 4× | 1 | valid |
Compiled 43 to 25 computations (41.9% saved)
ival-mult: 7.0ms (54.8% of total)ival-sub: 3.0ms (23.5% of total)ival-add: 2.0ms (15.7% of total)adjust: 0.0ms (0% of total)ival-assert: 0.0ms (0% of total)ival-true: 0.0ms (0% of total)exact: 0.0ms (0% of total)Useful iterations: 0 (0.0ms)
| Iter | Nodes | Cost |
|---|---|---|
| 0 | 25 | 77 |
| 1 | 75 | 75 |
| 2 | 159 | 75 |
| 3 | 281 | 71 |
| 4 | 570 | 70 |
| 5 | 1718 | 70 |
| 6 | 5305 | 70 |
| 0 | 6 | 7 |
| 0 | 9 | 7 |
| 1 | 18 | 7 |
| 2 | 33 | 7 |
| 3 | 64 | 7 |
| 4 | 152 | 7 |
| 5 | 528 | 7 |
| 6 | 4374 | 7 |
| 0 | 8205 | 6 |
| 1× | iter limit |
| 1× | node limit |
| 1× | iter limit |
| 1× | node limit |
| Inputs |
|---|
(+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
| Outputs |
|---|
(+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
(fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux)) |
(abs uy)
Compiled 7 to 7 computations (0% saved)
Compiled 0 to 3 computations (-∞% saved)
| Status | Accuracy | Program |
|---|---|---|
| ▶ | 99.9% | (+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
Compiled 7 to 7 computations (0% saved)
| Inputs |
|---|
(+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
(-.f32 #s(literal 1 binary32) ux) |
#s(literal 1 binary32) |
ux |
(*.f32 ux maxCos) |
maxCos |
| Outputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 1)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx (- 1 ux) #s(hole binary32 1)) |
#s(approx (- 1 ux) #s(hole binary32 (+ 1 (* -1 ux)))) |
#s(approx ux #s(hole binary32 ux)) |
#s(approx (* ux maxCos) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (- 1 ux) #s(hole binary32 (* -1 ux))) |
#s(approx (- 1 ux) #s(hole binary32 (* ux (- (/ 1 ux) 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (+ 1 (* -1 maxCos)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (- (+ 1 (* -1 maxCos)) (/ 1 ux)))))) |
#s(approx (- 1 ux) #s(hole binary32 (* -1 (* ux (- 1 (/ 1 ux)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- 1 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- (+ 1 (* maxCos ux)) ux))) |
#s(approx maxCos #s(hole binary32 maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (- 1 ux) maxCos))))))) |
9 calls:
| Time | Variable | Point | Expression | |
|---|---|---|---|---|
| 1.0ms | ux | @ | -inf | ((+ (- 1 ux) (* ux maxCos)) (- 1 ux) 1 ux (* ux maxCos) maxCos) |
| 1.0ms | ux | @ | inf | ((+ (- 1 ux) (* ux maxCos)) (- 1 ux) 1 ux (* ux maxCos) maxCos) |
| 1.0ms | maxCos | @ | 0 | ((+ (- 1 ux) (* ux maxCos)) (- 1 ux) 1 ux (* ux maxCos) maxCos) |
| 1.0ms | maxCos | @ | -inf | ((+ (- 1 ux) (* ux maxCos)) (- 1 ux) 1 ux (* ux maxCos) maxCos) |
| 1.0ms | maxCos | @ | inf | ((+ (- 1 ux) (* ux maxCos)) (- 1 ux) 1 ux (* ux maxCos) maxCos) |
Useful iterations: 0 (0.0ms)
| Iter | Nodes | Cost |
|---|---|---|
| 0 | 63 | 245 |
| 0 | 67 | 233 |
| 1 | 328 | 229 |
| 2 | 2853 | 228 |
| 0 | 8915 | 212 |
| 1× | iter limit |
| 1× | node limit |
| 1× | iter limit |
| Inputs |
|---|
(+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
(-.f32 #s(literal 1 binary32) ux) |
#s(literal 1 binary32) |
ux |
(*.f32 ux maxCos) |
maxCos |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 1)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx (- 1 ux) #s(hole binary32 1)) |
#s(approx (- 1 ux) #s(hole binary32 (+ 1 (* -1 ux)))) |
#s(approx ux #s(hole binary32 ux)) |
#s(approx (* ux maxCos) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (- 1 ux) #s(hole binary32 (* -1 ux))) |
#s(approx (- 1 ux) #s(hole binary32 (* ux (- (/ 1 ux) 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (+ 1 (* -1 maxCos)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (- (+ 1 (* -1 maxCos)) (/ 1 ux)))))) |
#s(approx (- 1 ux) #s(hole binary32 (* -1 (* ux (- 1 (/ 1 ux)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- 1 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- (+ 1 (* maxCos ux)) ux))) |
#s(approx maxCos #s(hole binary32 maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (- 1 ux) maxCos))))))) |
| Outputs |
|---|
(/.f32 (-.f32 (*.f32 #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux))) (*.f32 (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)))) (*.f32 (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)))) |
(/.f32 (-.f32 (*.f32 (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32)) (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32)))) (*.f32 (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))) (*.f32 ux ux))) (*.f32 (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))) (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))))) |
(/.f32 (-.f32 (*.f32 (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 3 binary32)) (fma.f32 ux (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32)))) (*.f32 (fma.f32 ux (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32))) (pow.f32 ux #s(literal 3 binary32)))) (*.f32 (fma.f32 ux (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32))) (fma.f32 ux (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32))))) |
(/.f32 (-.f32 (*.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32)) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 maxCos ux))) (*.f32 (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 maxCos ux)) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)))) (*.f32 (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 maxCos ux)) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 maxCos ux)))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (-.f32 maxCos #s(literal -1 binary32))) (*.f32 #s(literal 2 binary32) (*.f32 ux (-.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos))))) (*.f32 #s(literal 2 binary32) (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (-.f32 (+.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (neg.f32 maxCos))) (*.f32 #s(literal 2 binary32) (*.f32 ux (+.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32))))) (*.f32 #s(literal 2 binary32) (-.f32 (+.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (neg.f32 maxCos)))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (+.f32 ux (*.f32 maxCos ux))) (*.f32 #s(literal 2 binary32) (-.f32 (*.f32 ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))))) (*.f32 #s(literal 2 binary32) (+.f32 ux (*.f32 maxCos ux)))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (-.f32 ux (*.f32 (neg.f32 maxCos) ux))) (*.f32 #s(literal 2 binary32) (-.f32 (*.f32 ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))))) (*.f32 #s(literal 2 binary32) (-.f32 ux (*.f32 (neg.f32 maxCos) ux)))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (fma.f32 ux ux (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux (*.f32 maxCos ux))))) (*.f32 #s(literal 2 binary32) (-.f32 (pow.f32 ux #s(literal 3 binary32)) (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32))))) (*.f32 #s(literal 2 binary32) (fma.f32 ux ux (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux (*.f32 maxCos ux)))))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (fma.f32 ux ux (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux (*.f32 (neg.f32 maxCos) ux))))) (*.f32 #s(literal 2 binary32) (+.f32 (pow.f32 ux #s(literal 3 binary32)) (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32))))) (*.f32 #s(literal 2 binary32) (fma.f32 ux ux (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux (*.f32 (neg.f32 maxCos) ux)))))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (-.f32 maxCos #s(literal -1 binary32))) (*.f32 #s(literal 2 binary32) (*.f32 (-.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) ux))) (*.f32 #s(literal 2 binary32) (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (-.f32 (+.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (neg.f32 maxCos))) (*.f32 #s(literal 2 binary32) (*.f32 (+.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32)) ux))) (*.f32 #s(literal 2 binary32) (-.f32 (+.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (neg.f32 maxCos)))) |
(/.f32 (-.f32 (*.f32 #s(literal -1 binary32) (-.f32 maxCos #s(literal -1 binary32))) (*.f32 #s(literal -1 binary32) (*.f32 ux (-.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos))))) (*.f32 #s(literal -1 binary32) (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (-.f32 (*.f32 #s(literal -1 binary32) (-.f32 (+.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (neg.f32 maxCos))) (*.f32 #s(literal -1 binary32) (*.f32 ux (+.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32))))) (*.f32 #s(literal -1 binary32) (-.f32 (+.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (neg.f32 maxCos)))) |
(/.f32 (-.f32 (*.f32 #s(literal -1 binary32) (+.f32 ux (*.f32 maxCos ux))) (*.f32 #s(literal -1 binary32) (-.f32 (*.f32 ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))))) (*.f32 #s(literal -1 binary32) (+.f32 ux (*.f32 maxCos ux)))) |
(/.f32 (-.f32 (*.f32 #s(literal -1 binary32) (-.f32 ux (*.f32 (neg.f32 maxCos) ux))) (*.f32 #s(literal -1 binary32) (-.f32 (*.f32 ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))))) (*.f32 #s(literal -1 binary32) (-.f32 ux (*.f32 (neg.f32 maxCos) ux)))) |
(/.f32 (-.f32 (*.f32 #s(literal -1 binary32) (fma.f32 ux ux (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux (*.f32 maxCos ux))))) (*.f32 #s(literal -1 binary32) (-.f32 (pow.f32 ux #s(literal 3 binary32)) (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32))))) (*.f32 #s(literal -1 binary32) (fma.f32 ux ux (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux (*.f32 maxCos ux)))))) |
(/.f32 (-.f32 (*.f32 #s(literal -1 binary32) (fma.f32 ux ux (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux (*.f32 (neg.f32 maxCos) ux))))) (*.f32 #s(literal -1 binary32) (+.f32 (pow.f32 ux #s(literal 3 binary32)) (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32))))) (*.f32 #s(literal -1 binary32) (fma.f32 ux ux (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux (*.f32 (neg.f32 maxCos) ux)))))) |
(/.f32 (-.f32 (*.f32 #s(literal -1 binary32) (-.f32 maxCos #s(literal -1 binary32))) (*.f32 #s(literal -1 binary32) (*.f32 (-.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) ux))) (*.f32 #s(literal -1 binary32) (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (-.f32 (*.f32 #s(literal -1 binary32) (-.f32 (+.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (neg.f32 maxCos))) (*.f32 #s(literal -1 binary32) (*.f32 (+.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32)) ux))) (*.f32 #s(literal -1 binary32) (-.f32 (+.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (neg.f32 maxCos)))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (-.f32 maxCos #s(literal -1 binary32))) (*.f32 #s(literal 2 binary32) (*.f32 (neg.f32 ux) (fma.f32 maxCos maxCos #s(literal -1 binary32))))) (*.f32 #s(literal 2 binary32) (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32)))) (*.f32 #s(literal 2 binary32) (*.f32 (neg.f32 ux) (-.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32))))) (*.f32 #s(literal 2 binary32) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32))))) |
(/.f32 (-.f32 (*.f32 #s(literal -1 binary32) (-.f32 maxCos #s(literal -1 binary32))) (*.f32 #s(literal -1 binary32) (*.f32 (neg.f32 ux) (fma.f32 maxCos maxCos #s(literal -1 binary32))))) (*.f32 #s(literal -1 binary32) (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (-.f32 (*.f32 #s(literal -1 binary32) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32)))) (*.f32 #s(literal -1 binary32) (*.f32 (neg.f32 ux) (-.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32))))) (*.f32 #s(literal -1 binary32) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32))))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux) #s(literal 2 binary32))) (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux))) |
(/.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) #s(literal 1 binary32)) (-.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32))) |
(/.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32))) (-.f32 (*.f32 maxCos ux) (-.f32 #s(literal 1 binary32) ux))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 (-.f32 (*.f32 maxCos ux) ux) #s(literal 2 binary32))) (-.f32 #s(literal 1 binary32) (-.f32 (*.f32 maxCos ux) ux))) |
(/.f32 (-.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32))) (+.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32)) (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 (neg.f32 maxCos) ux))))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32))) (+.f32 #s(literal 1 binary32) (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (*.f32 #s(literal 1 binary32) (*.f32 (neg.f32 ux) (-.f32 maxCos #s(literal 1 binary32))))))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux) #s(literal 3 binary32))) (+.f32 #s(literal 1 binary32) (+.f32 (pow.f32 (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux) #s(literal 2 binary32)) (*.f32 #s(literal 1 binary32) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux))))) |
(/.f32 (+.f32 #s(literal 1 binary32) (pow.f32 (-.f32 (*.f32 maxCos ux) ux) #s(literal 3 binary32))) (+.f32 #s(literal 1 binary32) (-.f32 (pow.f32 (-.f32 (*.f32 maxCos ux) ux) #s(literal 2 binary32)) (*.f32 #s(literal 1 binary32) (-.f32 (*.f32 maxCos ux) ux))))) |
(/.f32 (neg.f32 (-.f32 #s(literal 1 binary32) (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)))) (neg.f32 (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)))) |
(/.f32 (neg.f32 (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal 1 binary32))) (neg.f32 (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (-.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) #s(literal 1 binary32)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32)) (*.f32 ux ux))) (neg.f32 (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32)))) (neg.f32 (fma.f32 ux (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32))))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32)) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)))) (neg.f32 (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 maxCos ux)))) |
(/.f32 (neg.f32 (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)))) (neg.f32 (fma.f32 (*.f32 maxCos ux) (-.f32 (*.f32 maxCos ux) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32))))) |
(/.f32 (-.f32 (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32)) (*.f32 ux ux)) (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32)))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32))) (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux))) |
(/.f32 (-.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32)) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 maxCos ux))) |
(/.f32 (-.f32 (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32))) (fma.f32 ux (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32)))) |
(/.f32 (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal 1 binary32)) (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)))) |
(/.f32 (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal 1 binary32)) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (-.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) #s(literal 1 binary32))) |
(/.f32 (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32))) (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (-.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32)) (*.f32 (*.f32 (-.f32 #s(literal 1 binary32) ux) maxCos) ux)))) |
(/.f32 (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32))) (fma.f32 (*.f32 maxCos ux) (-.f32 (*.f32 maxCos ux) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32)))) |
(-.f32 (/.f32 #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux))) (/.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)))) |
(-.f32 (/.f32 (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32)) (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32)))) (/.f32 (*.f32 ux ux) (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))))) |
(-.f32 (/.f32 (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 3 binary32)) (fma.f32 ux (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32)))) (/.f32 (pow.f32 ux #s(literal 3 binary32)) (fma.f32 ux (fma.f32 maxCos ux (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) #s(literal 2 binary32))))) |
(-.f32 (/.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32)) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 maxCos ux))) (/.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 maxCos ux)))) |
(-.f32 (fma.f32 maxCos ux #s(literal 1 binary32)) ux) |
(-.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal -1 binary32)) |
(-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 (neg.f32 maxCos) ux)) |
(-.f32 #s(literal 1 binary32) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
(-.f32 #s(literal 1 binary32) (*.f32 (neg.f32 ux) (-.f32 maxCos #s(literal 1 binary32)))) |
(fma.f32 (*.f32 #s(literal 1 binary32) (-.f32 maxCos #s(literal 1 binary32))) ux #s(literal 1 binary32)) |
(fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32) #s(literal 1 binary32)) |
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
(fma.f32 (*.f32 maxCos ux) #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) ux)) |
(fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux)) |
(fma.f32 ux (-.f32 maxCos #s(literal 1 binary32)) #s(literal 1 binary32)) |
(fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
(fma.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) |
(fma.f32 #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) ux) (*.f32 maxCos ux)) |
(fma.f32 #s(literal 1 binary32) (*.f32 maxCos ux) (-.f32 #s(literal 1 binary32) ux)) |
(+.f32 (/.f32 #s(literal 1 binary32) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (-.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) #s(literal 1 binary32))) (/.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (-.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) #s(literal 1 binary32)))) |
(+.f32 (/.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (fma.f32 (*.f32 maxCos ux) (-.f32 (*.f32 maxCos ux) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32)))) (/.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (fma.f32 (*.f32 maxCos ux) (-.f32 (*.f32 maxCos ux) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 2 binary32))))) |
(+.f32 (-.f32 (*.f32 maxCos ux) ux) #s(literal 1 binary32)) |
(+.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) |
(+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 maxCos ux)) |
(+.f32 (*.f32 maxCos ux) (-.f32 #s(literal 1 binary32) ux)) |
(+.f32 #s(literal 1 binary32) (-.f32 (*.f32 maxCos ux) ux)) |
(+.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
(*.f32 #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) ux)) |
(/.f32 (-.f32 (*.f32 #s(literal 1 binary32) (+.f32 ux #s(literal 1 binary32))) (*.f32 (+.f32 ux #s(literal 1 binary32)) (*.f32 ux ux))) (pow.f32 (+.f32 ux #s(literal 1 binary32)) #s(literal 2 binary32))) |
(/.f32 (-.f32 (*.f32 #s(literal 1 binary32) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32))) (*.f32 (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32)) (pow.f32 ux #s(literal 3 binary32)))) (pow.f32 (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32)) #s(literal 2 binary32))) |
(/.f32 (-.f32 (*.f32 ux ux) #s(literal 1 binary32)) (-.f32 (neg.f32 ux) #s(literal 1 binary32))) |
(/.f32 (neg.f32 (-.f32 #s(literal 1 binary32) (*.f32 ux ux))) (neg.f32 (+.f32 ux #s(literal 1 binary32)))) |
(/.f32 (neg.f32 (-.f32 #s(literal 1 binary32) (pow.f32 ux #s(literal 3 binary32)))) (neg.f32 (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32)))) |
(/.f32 (-.f32 #s(literal 1 binary32) (*.f32 ux ux)) (+.f32 ux #s(literal 1 binary32))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 ux #s(literal 3 binary32))) (fma.f32 ux ux (+.f32 ux #s(literal 1 binary32)))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 ux #s(literal 3 binary32))) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32))) |
(-.f32 (/.f32 #s(literal 1 binary32) (+.f32 ux #s(literal 1 binary32))) (/.f32 (*.f32 ux ux) (+.f32 ux #s(literal 1 binary32)))) |
(-.f32 (/.f32 #s(literal 1 binary32) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32))) (/.f32 (pow.f32 ux #s(literal 3 binary32)) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32)))) |
(-.f32 (neg.f32 ux) #s(literal -1 binary32)) |
(-.f32 #s(literal 1 binary32) (*.f32 (neg.f32 ux) #s(literal -1 binary32))) |
(-.f32 #s(literal 1 binary32) ux) |
(fma.f32 (neg.f32 ux) #s(literal 1 binary32) #s(literal 1 binary32)) |
(fma.f32 #s(literal -1 binary32) ux #s(literal 1 binary32)) |
(fma.f32 ux #s(literal -1 binary32) #s(literal 1 binary32)) |
(fma.f32 #s(literal 1 binary32) (neg.f32 ux) #s(literal 1 binary32)) |
(+.f32 (/.f32 #s(literal 1 binary32) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32))) (/.f32 (pow.f32 ux #s(literal 3 binary32)) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32)))) |
(+.f32 (neg.f32 ux) #s(literal 1 binary32)) |
(+.f32 #s(literal 1 binary32) (neg.f32 ux)) |
(neg.f32 (+.f32 ux #s(literal -1 binary32))) |
(neg.f32 (+.f32 #s(literal -1 binary32) ux)) |
#s(literal 1 binary32) |
ux |
(*.f32 (*.f32 maxCos ux) #s(literal 1 binary32)) |
(*.f32 maxCos ux) |
(*.f32 ux maxCos) |
(*.f32 #s(literal 1 binary32) (*.f32 maxCos ux)) |
(neg.f32 (*.f32 (neg.f32 maxCos) ux)) |
maxCos |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (- 1 ux) #s(literal 1 binary32)) |
#s(approx (- 1 ux) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx ux ux) |
#s(approx (* ux maxCos) (*.f32 maxCos ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (+.f32 (expm1.f32 (neg.f32 (log.f32 ux))) maxCos) ux)) |
#s(approx (- 1 ux) (neg.f32 ux)) |
#s(approx (- 1 ux) (*.f32 (expm1.f32 (neg.f32 (log.f32 ux))) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 #s(literal -1 binary32) ux (*.f32 maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) (+.f32 (/.f32 #s(literal 1 binary32) ux) maxCos)) (neg.f32 ux))) |
#s(approx (- 1 ux) (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) ux)) (neg.f32 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux))) |
#s(approx maxCos maxCos) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (+.f32 (/.f32 (-.f32 #s(literal 1 binary32) ux) maxCos) ux) maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 (/.f32 (+.f32 ux #s(literal -1 binary32)) maxCos) ux) (neg.f32 maxCos))) |
Compiled 2 274 to 398 computations (82.5% saved)
7 alts after pruning (7 fresh and 0 done)
| Pruned | Kept | Total | |
|---|---|---|---|
| New | 117 | 7 | 124 |
| Fresh | 0 | 0 | 0 |
| Picked | 1 | 0 | 1 |
| Done | 0 | 0 | 0 |
| Total | 118 | 7 | 125 |
| Status | Accuracy | Program |
|---|---|---|
| ▶ | 99.9% | (fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
| ▶ | 99.9% | (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
| 99.0% | (/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (+.f32 ux (*.f32 maxCos ux))) (*.f32 #s(literal 2 binary32) (-.f32 (*.f32 ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))))) (*.f32 #s(literal 2 binary32) (+.f32 ux (*.f32 maxCos ux)))) | |
| ▶ | 97.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
| 98.7% | #s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) (+.f32 (/.f32 #s(literal 1 binary32) ux) maxCos)) (neg.f32 ux))) | |
| ▶ | 9.3% | #s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
| ▶ | 70.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
Compiled 176 to 134 computations (23.9% saved)
| Inputs |
|---|
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
(-.f32 maxCos #s(literal 1 binary32)) |
maxCos |
#s(literal 1 binary32) |
ux |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
(-.f32 #s(literal 1 binary32) ux) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
(*.f32 maxCos ux) |
(fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
| Outputs |
|---|
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 1)) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx ux #s(hole binary32 ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 1)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx (- 1 ux) #s(hole binary32 1)) |
#s(approx (- 1 ux) #s(hole binary32 (+ 1 (* -1 ux)))) |
#s(approx (* maxCos ux) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 1)) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (- 1 ux) #s(hole binary32 (* -1 ux))) |
#s(approx (- 1 ux) #s(hole binary32 (* ux (- (/ 1 ux) 1)))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* -1 (* ux (- (* -1 (- maxCos 1)) (/ 1 ux)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (+ 1 (* -1 maxCos)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (- (+ 1 (* -1 maxCos)) (/ 1 ux)))))) |
#s(approx (- 1 ux) #s(hole binary32 (* -1 (* ux (- 1 (/ 1 ux)))))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* -1 (* ux (+ 1 (* -1 maxCos)))))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* -1 (* ux (- (+ 1 (* -1 maxCos)) (/ 1 ux)))))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (+ 1 (* -1 ux)))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (+ 1 (+ (* -1 ux) (* maxCos ux))))) |
#s(approx (- maxCos 1) #s(hole binary32 -1)) |
#s(approx (- maxCos 1) #s(hole binary32 (- maxCos 1))) |
#s(approx maxCos #s(hole binary32 maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- 1 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- (+ 1 (* maxCos ux)) ux))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (- 1 ux))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (- (+ 1 (* maxCos ux)) ux))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* maxCos (+ ux (+ (* -1 (/ ux maxCos)) (/ 1 maxCos)))))) |
#s(approx (- maxCos 1) #s(hole binary32 maxCos)) |
#s(approx (- maxCos 1) #s(hole binary32 (* maxCos (- 1 (/ 1 maxCos))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (+ 1 (* -1 ux)) maxCos))))))) |
#s(approx (- maxCos 1) #s(hole binary32 (* -1 (* maxCos (- (/ 1 maxCos) 1))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (- 1 ux) maxCos))))))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (- 1 ux) maxCos))))))) |
9 calls:
| Time | Variable | Point | Expression | |
|---|---|---|---|---|
| 1.0ms | maxCos | @ | -inf | ((+ (* (- maxCos 1) ux) 1) (- maxCos 1) maxCos 1 ux (+ (- 1 ux) (* ux maxCos)) (+ (- 1 ux) (* ux maxCos)) (- 1 ux) (+ (- 1 ux) (* ux maxCos)) (* maxCos ux) (+ (* ux maxCos) (- 1 ux))) |
| 1.0ms | ux | @ | -inf | ((+ (* (- maxCos 1) ux) 1) (- maxCos 1) maxCos 1 ux (+ (- 1 ux) (* ux maxCos)) (+ (- 1 ux) (* ux maxCos)) (- 1 ux) (+ (- 1 ux) (* ux maxCos)) (* maxCos ux) (+ (* ux maxCos) (- 1 ux))) |
| 1.0ms | maxCos | @ | 0 | ((+ (* (- maxCos 1) ux) 1) (- maxCos 1) maxCos 1 ux (+ (- 1 ux) (* ux maxCos)) (+ (- 1 ux) (* ux maxCos)) (- 1 ux) (+ (- 1 ux) (* ux maxCos)) (* maxCos ux) (+ (* ux maxCos) (- 1 ux))) |
| 1.0ms | maxCos | @ | inf | ((+ (* (- maxCos 1) ux) 1) (- maxCos 1) maxCos 1 ux (+ (- 1 ux) (* ux maxCos)) (+ (- 1 ux) (* ux maxCos)) (- 1 ux) (+ (- 1 ux) (* ux maxCos)) (* maxCos ux) (+ (* ux maxCos) (- 1 ux))) |
| 1.0ms | ux | @ | inf | ((+ (* (- maxCos 1) ux) 1) (- maxCos 1) maxCos 1 ux (+ (- 1 ux) (* ux maxCos)) (+ (- 1 ux) (* ux maxCos)) (- 1 ux) (+ (- 1 ux) (* ux maxCos)) (* maxCos ux) (+ (* ux maxCos) (- 1 ux))) |
Useful iterations: 0 (0.0ms)
| Iter | Nodes | Cost |
|---|---|---|
| 0 | 116 | 637 |
| 0 | 118 | 582 |
| 1 | 539 | 566 |
| 2 | 4667 | 566 |
| 0 | 8222 | 558 |
| 1× | iter limit |
| 1× | node limit |
| 1× | iter limit |
| Inputs |
|---|
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
(-.f32 maxCos #s(literal 1 binary32)) |
maxCos |
#s(literal 1 binary32) |
ux |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
(-.f32 #s(literal 1 binary32) ux) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
(*.f32 maxCos ux) |
(fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 1)) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx ux #s(hole binary32 ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 1)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx (- 1 ux) #s(hole binary32 1)) |
#s(approx (- 1 ux) #s(hole binary32 (+ 1 (* -1 ux)))) |
#s(approx (* maxCos ux) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 1)) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (- 1 ux) #s(hole binary32 (* -1 ux))) |
#s(approx (- 1 ux) #s(hole binary32 (* ux (- (/ 1 ux) 1)))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* -1 (* ux (- (* -1 (- maxCos 1)) (/ 1 ux)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (+ 1 (* -1 maxCos)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (- (+ 1 (* -1 maxCos)) (/ 1 ux)))))) |
#s(approx (- 1 ux) #s(hole binary32 (* -1 (* ux (- 1 (/ 1 ux)))))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* -1 (* ux (+ 1 (* -1 maxCos)))))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* -1 (* ux (- (+ 1 (* -1 maxCos)) (/ 1 ux)))))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (+ 1 (* -1 ux)))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (+ 1 (+ (* -1 ux) (* maxCos ux))))) |
#s(approx (- maxCos 1) #s(hole binary32 -1)) |
#s(approx (- maxCos 1) #s(hole binary32 (- maxCos 1))) |
#s(approx maxCos #s(hole binary32 maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- 1 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- (+ 1 (* maxCos ux)) ux))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (- 1 ux))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (- (+ 1 (* maxCos ux)) ux))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* maxCos (+ ux (+ (* -1 (/ ux maxCos)) (/ 1 maxCos)))))) |
#s(approx (- maxCos 1) #s(hole binary32 maxCos)) |
#s(approx (- maxCos 1) #s(hole binary32 (* maxCos (- 1 (/ 1 maxCos))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (+ (* (- maxCos 1) ux) 1) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (+ 1 (* -1 ux)) maxCos))))))) |
#s(approx (- maxCos 1) #s(hole binary32 (* -1 (* maxCos (- (/ 1 maxCos) 1))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (- 1 ux) maxCos))))))) |
#s(approx (+ (* ux maxCos) (- 1 ux)) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (- 1 ux) maxCos))))))) |
| Outputs |
|---|
(*.f32 #s(literal 1 binary32) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32))) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)) #s(literal 1 binary32))) |
(/.f32 (-.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32))) (+.f32 (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)) (+.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)) (*.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 (neg.f32 maxCos) ux))))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32)) (*.f32 ux ux))) (neg.f32 (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)))) (neg.f32 (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)))) (neg.f32 (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32)))) (neg.f32 (fma.f32 ux (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32))))) |
(/.f32 (neg.f32 (+.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32)))) (neg.f32 (fma.f32 (-.f32 #s(literal 1 binary32) ux) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32))))) |
(/.f32 (neg.f32 (+.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32)))) (neg.f32 (fma.f32 (*.f32 ux maxCos) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32))))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) #s(literal 1 binary32))) (neg.f32 (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)))) |
(/.f32 (neg.f32 (pow.f32 (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) #s(literal 2 binary32))) (neg.f32 (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal -1 binary32))) (neg.f32 (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)) #s(literal 1 binary32)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal -1 binary32))) (neg.f32 (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))))) |
(/.f32 (-.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32)) (*.f32 ux ux)) (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32)))) |
(/.f32 (-.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32))) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux))) |
(/.f32 (-.f32 (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32))) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos))) |
(/.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) #s(literal 1 binary32)) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32))) |
(/.f32 (pow.f32 (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) |
(/.f32 (-.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32))) (fma.f32 ux (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32)))) |
(/.f32 (+.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32))) (fma.f32 (-.f32 #s(literal 1 binary32) ux) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)))) |
(/.f32 (+.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32))) (fma.f32 (*.f32 ux maxCos) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)))) |
(/.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal -1 binary32)) (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)))) |
(/.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal -1 binary32)) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)) #s(literal 1 binary32))) |
(-.f32 (/.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32)) (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32)))) (/.f32 (*.f32 ux ux) (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))))) |
(-.f32 (/.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux))) (/.f32 (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)))) |
(-.f32 (/.f32 (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos))) (/.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)))) |
(-.f32 (/.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 3 binary32)) (fma.f32 ux (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32)))) (/.f32 (pow.f32 ux #s(literal 3 binary32)) (fma.f32 ux (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32))))) |
(-.f32 (/.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32))) (/.f32 #s(literal 1 binary32) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)))) |
(-.f32 (/.f32 #s(literal 1 binary32) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) (/.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)))) |
(-.f32 (+.f32 ux #s(literal 1 binary32)) (*.f32 ux maxCos)) |
(-.f32 (-.f32 #s(literal 1 binary32) (*.f32 ux maxCos)) (neg.f32 ux)) |
(-.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) ux) |
(-.f32 (neg.f32 ux) (-.f32 (*.f32 (neg.f32 maxCos) ux) #s(literal 1 binary32))) |
(-.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal -1 binary32)) |
(-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 (neg.f32 maxCos) ux)) |
(-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
(fma.f32 (*.f32 #s(literal -1 binary32) (-.f32 #s(literal 1 binary32) maxCos)) ux #s(literal 1 binary32)) |
(fma.f32 (*.f32 #s(literal 1 binary32) (-.f32 maxCos #s(literal 1 binary32))) ux #s(literal 1 binary32)) |
(fma.f32 (neg.f32 (-.f32 #s(literal 1 binary32) maxCos)) ux #s(literal 1 binary32)) |
(fma.f32 (-.f32 #s(literal 1 binary32) maxCos) (neg.f32 ux) #s(literal 1 binary32)) |
(fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal 1 binary32)) |
(fma.f32 (*.f32 ux maxCos) #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) ux)) |
(fma.f32 (neg.f32 ux) (-.f32 #s(literal 1 binary32) maxCos) #s(literal 1 binary32)) |
(fma.f32 (neg.f32 ux) (-.f32 maxCos #s(literal 1 binary32)) #s(literal 1 binary32)) |
(fma.f32 (neg.f32 ux) #s(literal 1 binary32) (fma.f32 ux maxCos #s(literal 1 binary32))) |
(fma.f32 #s(literal -1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) |
(fma.f32 #s(literal -1 binary32) ux (fma.f32 ux maxCos #s(literal 1 binary32))) |
(fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal -1 binary32) #s(literal 1 binary32)) |
(fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32) #s(literal 1 binary32)) |
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) (neg.f32 ux) #s(literal 1 binary32)) |
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
(fma.f32 ux (*.f32 (-.f32 #s(literal 1 binary32) maxCos) #s(literal -1 binary32)) #s(literal 1 binary32)) |
(fma.f32 ux (*.f32 #s(literal -1 binary32) (-.f32 #s(literal 1 binary32) maxCos)) #s(literal 1 binary32)) |
(fma.f32 ux (-.f32 #s(literal -1 binary32) (neg.f32 maxCos)) #s(literal 1 binary32)) |
(fma.f32 ux (*.f32 (-.f32 maxCos #s(literal 1 binary32)) #s(literal 1 binary32)) #s(literal 1 binary32)) |
(fma.f32 ux (neg.f32 (-.f32 #s(literal 1 binary32) maxCos)) #s(literal 1 binary32)) |
(fma.f32 ux (-.f32 #s(literal 1 binary32) maxCos) #s(literal 1 binary32)) |
(fma.f32 ux #s(literal -1 binary32) (fma.f32 ux maxCos #s(literal 1 binary32))) |
(fma.f32 ux (-.f32 maxCos #s(literal 1 binary32)) #s(literal 1 binary32)) |
(fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
(fma.f32 #s(literal 1 binary32) (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) |
(fma.f32 #s(literal 1 binary32) (neg.f32 ux) (fma.f32 ux maxCos #s(literal 1 binary32))) |
(fma.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) |
(fma.f32 #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
(fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux)) |
(+.f32 (/.f32 #s(literal 1 binary32) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)) #s(literal 1 binary32))) (/.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)) #s(literal 1 binary32)))) |
(+.f32 (/.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32)) (fma.f32 (-.f32 #s(literal 1 binary32) ux) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)))) (/.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (fma.f32 (-.f32 #s(literal 1 binary32) ux) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32))))) |
(+.f32 (/.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (fma.f32 (*.f32 ux maxCos) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)))) (/.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32)) (fma.f32 (*.f32 ux maxCos) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32))))) |
(+.f32 (/.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)))) (/.f32 #s(literal 1 binary32) (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))))) |
(+.f32 (+.f32 ux #s(literal 1 binary32)) (*.f32 (neg.f32 maxCos) ux)) |
(+.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) (neg.f32 ux)) |
(+.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) |
(+.f32 (neg.f32 ux) (fma.f32 ux maxCos #s(literal 1 binary32))) |
(+.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) |
(+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
(+.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
(/.f32 (+.f32 #s(literal -1 binary32) (pow.f32 maxCos #s(literal 3 binary32))) (-.f32 (+.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (neg.f32 maxCos))) |
(/.f32 (neg.f32 (fma.f32 maxCos maxCos #s(literal -1 binary32))) (neg.f32 (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32))) (neg.f32 (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32))))) |
(/.f32 (fma.f32 maxCos maxCos #s(literal -1 binary32)) (-.f32 maxCos #s(literal -1 binary32))) |
(/.f32 (-.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (-.f32 #s(literal -1 binary32) maxCos)) |
(/.f32 (-.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32)) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32)))) |
(-.f32 (/.f32 (pow.f32 maxCos #s(literal 3 binary32)) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32)))) (/.f32 #s(literal 1 binary32) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32))))) |
(-.f32 (/.f32 (*.f32 maxCos maxCos) (-.f32 maxCos #s(literal -1 binary32))) (/.f32 #s(literal 1 binary32) (-.f32 maxCos #s(literal -1 binary32)))) |
(-.f32 maxCos #s(literal 1 binary32)) |
(+.f32 #s(literal -1 binary32) maxCos) |
(+.f32 maxCos #s(literal -1 binary32)) |
maxCos |
#s(literal 1 binary32) |
ux |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
(*.f32 #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) ux)) |
(/.f32 (-.f32 (*.f32 ux ux) #s(literal 1 binary32)) (-.f32 (neg.f32 ux) #s(literal 1 binary32))) |
(/.f32 (neg.f32 (-.f32 #s(literal 1 binary32) (*.f32 ux ux))) (neg.f32 (+.f32 ux #s(literal 1 binary32)))) |
(/.f32 (neg.f32 (-.f32 #s(literal 1 binary32) (pow.f32 ux #s(literal 3 binary32)))) (neg.f32 (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32)))) |
(/.f32 (-.f32 #s(literal 1 binary32) (*.f32 ux ux)) (+.f32 ux #s(literal 1 binary32))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 ux #s(literal 3 binary32))) (fma.f32 ux ux (+.f32 ux #s(literal 1 binary32)))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 ux #s(literal 3 binary32))) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32))) |
(-.f32 (/.f32 #s(literal 1 binary32) (+.f32 ux #s(literal 1 binary32))) (/.f32 (*.f32 ux ux) (+.f32 ux #s(literal 1 binary32)))) |
(-.f32 (/.f32 #s(literal 1 binary32) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32))) (/.f32 (pow.f32 ux #s(literal 3 binary32)) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32)))) |
(-.f32 (neg.f32 ux) #s(literal -1 binary32)) |
(-.f32 #s(literal 1 binary32) (*.f32 (neg.f32 ux) #s(literal -1 binary32))) |
(-.f32 #s(literal 1 binary32) ux) |
(fma.f32 (neg.f32 ux) #s(literal 1 binary32) #s(literal 1 binary32)) |
(fma.f32 #s(literal -1 binary32) ux #s(literal 1 binary32)) |
(fma.f32 ux #s(literal -1 binary32) #s(literal 1 binary32)) |
(fma.f32 #s(literal 1 binary32) (neg.f32 ux) #s(literal 1 binary32)) |
(+.f32 (/.f32 #s(literal 1 binary32) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32))) (/.f32 (pow.f32 ux #s(literal 3 binary32)) (+.f32 (fma.f32 ux ux ux) #s(literal 1 binary32)))) |
(+.f32 (neg.f32 ux) #s(literal 1 binary32)) |
(+.f32 #s(literal 1 binary32) (neg.f32 ux)) |
(neg.f32 (+.f32 #s(literal -1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 ux maxCos)) |
(*.f32 (*.f32 ux maxCos) #s(literal 1 binary32)) |
(*.f32 ux maxCos) |
(*.f32 #s(literal 1 binary32) (*.f32 ux maxCos)) |
(*.f32 maxCos ux) |
(neg.f32 (*.f32 (neg.f32 maxCos) ux)) |
(*.f32 #s(literal 1 binary32) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32))) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)) #s(literal 1 binary32))) |
(/.f32 (-.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32))) (+.f32 (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)) (+.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)) (*.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 (neg.f32 maxCos) ux))))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32)) (*.f32 ux ux))) (neg.f32 (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)))) (neg.f32 (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)))) (neg.f32 (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32)))) (neg.f32 (fma.f32 ux (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32))))) |
(/.f32 (neg.f32 (+.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32)))) (neg.f32 (fma.f32 (-.f32 #s(literal 1 binary32) ux) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32))))) |
(/.f32 (neg.f32 (+.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32)))) (neg.f32 (fma.f32 (*.f32 ux maxCos) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32))))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) #s(literal 1 binary32))) (neg.f32 (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)))) |
(/.f32 (neg.f32 (pow.f32 (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) #s(literal 2 binary32))) (neg.f32 (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal -1 binary32))) (neg.f32 (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)) #s(literal 1 binary32)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal -1 binary32))) (neg.f32 (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))))) |
(/.f32 (-.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32)) (*.f32 ux ux)) (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32)))) |
(/.f32 (-.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32))) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux))) |
(/.f32 (-.f32 (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32))) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos))) |
(/.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) #s(literal 1 binary32)) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32))) |
(/.f32 (pow.f32 (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) |
(/.f32 (-.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32))) (fma.f32 ux (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32)))) |
(/.f32 (+.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32))) (fma.f32 (-.f32 #s(literal 1 binary32) ux) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)))) |
(/.f32 (+.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32))) (fma.f32 (*.f32 ux maxCos) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)))) |
(/.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal -1 binary32)) (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)))) |
(/.f32 (-.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) #s(literal -1 binary32)) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)) #s(literal 1 binary32))) |
(-.f32 (/.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32)) (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32)))) (/.f32 (*.f32 ux ux) (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))))) |
(-.f32 (/.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux))) (/.f32 (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)))) |
(-.f32 (/.f32 (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos))) (/.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)))) |
(-.f32 (/.f32 (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 3 binary32)) (fma.f32 ux (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32)))) (/.f32 (pow.f32 ux #s(literal 3 binary32)) (fma.f32 ux (fma.f32 ux maxCos (+.f32 ux #s(literal 1 binary32))) (pow.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) #s(literal 2 binary32))))) |
(-.f32 (/.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32))) (/.f32 #s(literal 1 binary32) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)))) |
(-.f32 (/.f32 #s(literal 1 binary32) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) (/.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)))) |
(-.f32 (+.f32 ux #s(literal 1 binary32)) (*.f32 ux maxCos)) |
(-.f32 (-.f32 #s(literal 1 binary32) (*.f32 ux maxCos)) (neg.f32 ux)) |
(-.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) ux) |
(-.f32 (neg.f32 ux) (-.f32 (*.f32 (neg.f32 maxCos) ux) #s(literal 1 binary32))) |
(-.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal -1 binary32)) |
(-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 (neg.f32 maxCos) ux)) |
(-.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
(fma.f32 (*.f32 #s(literal -1 binary32) (-.f32 #s(literal 1 binary32) maxCos)) ux #s(literal 1 binary32)) |
(fma.f32 (*.f32 #s(literal 1 binary32) (-.f32 maxCos #s(literal 1 binary32))) ux #s(literal 1 binary32)) |
(fma.f32 (neg.f32 (-.f32 #s(literal 1 binary32) maxCos)) ux #s(literal 1 binary32)) |
(fma.f32 (-.f32 #s(literal 1 binary32) maxCos) (neg.f32 ux) #s(literal 1 binary32)) |
(fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal 1 binary32)) |
(fma.f32 (*.f32 ux maxCos) #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) ux)) |
(fma.f32 (neg.f32 ux) (-.f32 #s(literal 1 binary32) maxCos) #s(literal 1 binary32)) |
(fma.f32 (neg.f32 ux) (-.f32 maxCos #s(literal 1 binary32)) #s(literal 1 binary32)) |
(fma.f32 (neg.f32 ux) #s(literal 1 binary32) (fma.f32 ux maxCos #s(literal 1 binary32))) |
(fma.f32 #s(literal -1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) |
(fma.f32 #s(literal -1 binary32) ux (fma.f32 ux maxCos #s(literal 1 binary32))) |
(fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal -1 binary32) #s(literal 1 binary32)) |
(fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32) #s(literal 1 binary32)) |
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) (neg.f32 ux) #s(literal 1 binary32)) |
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
(fma.f32 ux (*.f32 (-.f32 #s(literal 1 binary32) maxCos) #s(literal -1 binary32)) #s(literal 1 binary32)) |
(fma.f32 ux (*.f32 #s(literal -1 binary32) (-.f32 #s(literal 1 binary32) maxCos)) #s(literal 1 binary32)) |
(fma.f32 ux (-.f32 #s(literal -1 binary32) (neg.f32 maxCos)) #s(literal 1 binary32)) |
(fma.f32 ux (*.f32 (-.f32 maxCos #s(literal 1 binary32)) #s(literal 1 binary32)) #s(literal 1 binary32)) |
(fma.f32 ux (neg.f32 (-.f32 #s(literal 1 binary32) maxCos)) #s(literal 1 binary32)) |
(fma.f32 ux (-.f32 #s(literal 1 binary32) maxCos) #s(literal 1 binary32)) |
(fma.f32 ux #s(literal -1 binary32) (fma.f32 ux maxCos #s(literal 1 binary32))) |
(fma.f32 ux (-.f32 maxCos #s(literal 1 binary32)) #s(literal 1 binary32)) |
(fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
(fma.f32 #s(literal 1 binary32) (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) |
(fma.f32 #s(literal 1 binary32) (neg.f32 ux) (fma.f32 ux maxCos #s(literal 1 binary32))) |
(fma.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) |
(fma.f32 #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
(fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux)) |
(+.f32 (/.f32 #s(literal 1 binary32) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)) #s(literal 1 binary32))) (/.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) (fma.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) (fma.f32 (-.f32 #s(literal 1 binary32) maxCos) ux #s(literal -1 binary32)) #s(literal 1 binary32)))) |
(+.f32 (/.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32)) (fma.f32 (-.f32 #s(literal 1 binary32) ux) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32)))) (/.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (fma.f32 (-.f32 #s(literal 1 binary32) ux) (-.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) (pow.f32 (*.f32 ux maxCos) #s(literal 2 binary32))))) |
(+.f32 (/.f32 (pow.f32 (-.f32 #s(literal 1 binary32) ux) #s(literal 3 binary32)) (fma.f32 (*.f32 ux maxCos) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32)))) (/.f32 (pow.f32 (*.f32 ux maxCos) #s(literal 3 binary32)) (fma.f32 (*.f32 ux maxCos) (-.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) (pow.f32 (+.f32 #s(literal -1 binary32) ux) #s(literal 2 binary32))))) |
(+.f32 (/.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 3 binary32)) (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)))) (/.f32 #s(literal 1 binary32) (+.f32 (pow.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 2 binary32)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))))) |
(+.f32 (+.f32 ux #s(literal 1 binary32)) (*.f32 (neg.f32 maxCos) ux)) |
(+.f32 (fma.f32 ux maxCos #s(literal 1 binary32)) (neg.f32 ux)) |
(+.f32 (*.f32 ux maxCos) (-.f32 #s(literal 1 binary32) ux)) |
(+.f32 (neg.f32 ux) (fma.f32 ux maxCos #s(literal 1 binary32))) |
(+.f32 (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) #s(literal 1 binary32)) |
(+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
(+.f32 #s(literal 1 binary32) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) |
#s(approx ux ux) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (- 1 ux) #s(literal 1 binary32)) |
#s(approx (- 1 ux) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (* maxCos ux) (*.f32 ux maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (+.f32 (expm1.f32 (neg.f32 (log.f32 ux))) maxCos) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (+.f32 (expm1.f32 (neg.f32 (log.f32 ux))) maxCos) ux)) |
#s(approx (- 1 ux) (neg.f32 ux)) |
#s(approx (- 1 ux) (*.f32 (expm1.f32 (neg.f32 (log.f32 ux))) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (+.f32 (expm1.f32 (neg.f32 (log.f32 ux))) maxCos) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) (+.f32 (/.f32 #s(literal 1 binary32) ux) maxCos)) (neg.f32 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) (+.f32 (/.f32 #s(literal 1 binary32) ux) maxCos)) (neg.f32 ux))) |
#s(approx (- 1 ux) (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) ux)) (neg.f32 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) (+.f32 (/.f32 #s(literal 1 binary32) ux) maxCos)) (neg.f32 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (- maxCos 1) #s(literal -1 binary32)) |
#s(approx (- maxCos 1) (-.f32 maxCos #s(literal 1 binary32))) |
#s(approx maxCos maxCos) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 ux maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32))) |
#s(approx (- maxCos 1) maxCos) |
#s(approx (- maxCos 1) (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) maxCos)) maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 ux maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 ux maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 (/.f32 (+.f32 #s(literal -1 binary32) ux) maxCos) ux) (neg.f32 maxCos))) |
#s(approx (- maxCos 1) (*.f32 (expm1.f32 (neg.f32 (log.f32 maxCos))) (neg.f32 maxCos))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 (/.f32 (+.f32 #s(literal -1 binary32) ux) maxCos) ux) (neg.f32 maxCos))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 (/.f32 (+.f32 #s(literal -1 binary32) ux) maxCos) ux) (neg.f32 maxCos))) |
Compiled 2 420 to 373 computations (84.6% saved)
6 alts after pruning (1 fresh and 5 done)
| Pruned | Kept | Total | |
|---|---|---|---|
| New | 177 | 1 | 178 |
| Fresh | 2 | 0 | 2 |
| Picked | 0 | 5 | 5 |
| Done | 0 | 0 | 0 |
| Total | 179 | 6 | 185 |
| Status | Accuracy | Program |
|---|---|---|
| ✓ | 99.9% | (fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
| ✓ | 99.9% | (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
| ▶ | 99.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32))) |
| ✓ | 97.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
| ✓ | 9.3% | #s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
| ✓ | 70.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
Compiled 59 to 52 computations (11.9% saved)
| Inputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32))) |
(fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32)) |
(-.f32 ux (/.f32 ux maxCos)) |
ux |
(/.f32 ux maxCos) |
maxCos |
#s(literal 1 binary32) |
| Outputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 1)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 1)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (* maxCos (* ux (- 1 (/ 1 maxCos))))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* ux (- 1 (/ 1 maxCos))))) |
#s(approx ux #s(hole binary32 ux)) |
#s(approx (/ ux maxCos) #s(hole binary32 (/ ux maxCos))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos (* ux (- 1 (/ 1 maxCos)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* ux (+ (* maxCos (- 1 (/ 1 maxCos))) (/ 1 ux))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (+ 1 (* -1 maxCos)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (- (+ 1 (* -1 maxCos)) (/ 1 ux)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* maxCos (* ux (- (/ 1 maxCos) 1)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* ux (- (* maxCos (- (/ 1 maxCos) 1)) (/ 1 ux)))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* -1 (* ux (- (/ 1 maxCos) 1))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- 1 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- (+ 1 (* maxCos ux)) ux))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (* -1 ux)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (+ (* -1 ux) (* maxCos ux))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* -1 (/ ux maxCos)))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (/ (- (* maxCos ux) ux) maxCos))) |
#s(approx maxCos #s(hole binary32 maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 ux)) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (+ ux (* -1 (/ ux maxCos))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (- 1 ux) maxCos))))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (+ 1 (* -1 ux)) maxCos))))))) |
9 calls:
| Time | Variable | Point | Expression | |
|---|---|---|---|---|
| 1.0ms | ux | @ | -inf | ((+ (- 1 ux) (* ux maxCos)) (+ (* (- ux (/ ux maxCos)) maxCos) 1) (- ux (/ ux maxCos)) ux (/ ux maxCos) maxCos 1) |
| 1.0ms | maxCos | @ | -inf | ((+ (- 1 ux) (* ux maxCos)) (+ (* (- ux (/ ux maxCos)) maxCos) 1) (- ux (/ ux maxCos)) ux (/ ux maxCos) maxCos 1) |
| 1.0ms | ux | @ | inf | ((+ (- 1 ux) (* ux maxCos)) (+ (* (- ux (/ ux maxCos)) maxCos) 1) (- ux (/ ux maxCos)) ux (/ ux maxCos) maxCos 1) |
| 1.0ms | ux | @ | 0 | ((+ (- 1 ux) (* ux maxCos)) (+ (* (- ux (/ ux maxCos)) maxCos) 1) (- ux (/ ux maxCos)) ux (/ ux maxCos) maxCos 1) |
| 1.0ms | maxCos | @ | 0 | ((+ (- 1 ux) (* ux maxCos)) (+ (* (- ux (/ ux maxCos)) maxCos) 1) (- ux (/ ux maxCos)) ux (/ ux maxCos) maxCos 1) |
Useful iterations: 0 (0.0ms)
| Iter | Nodes | Cost |
|---|---|---|
| 0 | 101 | 495 |
| 0 | 107 | 468 |
| 1 | 526 | 460 |
| 2 | 4649 | 460 |
| 0 | 8230 | 439 |
| 1× | iter limit |
| 1× | node limit |
| 1× | iter limit |
| Inputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32))) |
(fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32)) |
(-.f32 ux (/.f32 ux maxCos)) |
ux |
(/.f32 ux maxCos) |
maxCos |
#s(literal 1 binary32) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 1)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 1)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (* maxCos (* ux (- 1 (/ 1 maxCos))))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* ux (- 1 (/ 1 maxCos))))) |
#s(approx ux #s(hole binary32 ux)) |
#s(approx (/ ux maxCos) #s(hole binary32 (/ ux maxCos))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos (* ux (- 1 (/ 1 maxCos)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* ux (+ (* maxCos (- 1 (/ 1 maxCos))) (/ 1 ux))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (+ 1 (* -1 maxCos)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (- (+ 1 (* -1 maxCos)) (/ 1 ux)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* maxCos (* ux (- (/ 1 maxCos) 1)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* ux (- (* maxCos (- (/ 1 maxCos) 1)) (/ 1 ux)))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* -1 (* ux (- (/ 1 maxCos) 1))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- 1 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- (+ 1 (* maxCos ux)) ux))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (* -1 ux)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (+ (* -1 ux) (* maxCos ux))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* -1 (/ ux maxCos)))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (/ (- (* maxCos ux) ux) maxCos))) |
#s(approx maxCos #s(hole binary32 maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 ux)) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (+ ux (* -1 (/ ux maxCos))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (- 1 ux) maxCos))))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (+ 1 (* -1 ux)) maxCos))))))) |
| Outputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 2 binary32))) (-.f32 #s(literal 1 binary32) (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 2 binary32)) #s(literal 1 binary32))) (neg.f32 (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal -1 binary32)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 3 binary32)) #s(literal -1 binary32))) (neg.f32 (-.f32 (+.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 2 binary32)) #s(literal 1 binary32)) (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos)))) |
(/.f32 (-.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 2 binary32)) #s(literal 1 binary32)) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal -1 binary32))) |
(/.f32 (-.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 3 binary32)) #s(literal -1 binary32)) (+.f32 #s(literal 1 binary32) (-.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 2 binary32)) (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos)))) |
(/.f32 (-.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 3 binary32)) #s(literal -1 binary32)) (-.f32 (+.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 2 binary32)) #s(literal 1 binary32)) (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos))) |
(-.f32 (/.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 2 binary32)) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal -1 binary32))) (/.f32 #s(literal 1 binary32) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal -1 binary32)))) |
(-.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal -1 binary32)) |
(-.f32 #s(literal 1 binary32) (*.f32 (neg.f32 (-.f32 ux (/.f32 ux maxCos))) maxCos)) |
(-.f32 #s(literal 1 binary32) (*.f32 (neg.f32 maxCos) (-.f32 ux (/.f32 ux maxCos)))) |
(fma.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 1 binary32) #s(literal 1 binary32)) |
(fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32)) |
(fma.f32 maxCos (*.f32 (-.f32 ux (/.f32 ux maxCos)) #s(literal 1 binary32)) #s(literal 1 binary32)) |
(fma.f32 maxCos (-.f32 ux (/.f32 ux maxCos)) #s(literal 1 binary32)) |
(fma.f32 #s(literal 1 binary32) (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 1 binary32)) |
(+.f32 (/.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 3 binary32)) (-.f32 (+.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 2 binary32)) #s(literal 1 binary32)) (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos))) (/.f32 #s(literal 1 binary32) (-.f32 (+.f32 (pow.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 2 binary32)) #s(literal 1 binary32)) (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos)))) |
(+.f32 (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos) #s(literal 1 binary32)) |
(+.f32 #s(literal 1 binary32) (*.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos)) |
(/.f32 (-.f32 (pow.f32 (/.f32 ux maxCos) #s(literal 2 binary32)) (*.f32 ux ux)) (-.f32 (/.f32 (neg.f32 ux) maxCos) ux)) |
(/.f32 (neg.f32 (-.f32 (*.f32 ux ux) (pow.f32 (/.f32 ux maxCos) #s(literal 2 binary32)))) (neg.f32 (+.f32 (/.f32 ux maxCos) ux))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 ux #s(literal 3 binary32)) (pow.f32 (/.f32 ux maxCos) #s(literal 3 binary32)))) (neg.f32 (fma.f32 (/.f32 ux maxCos) (+.f32 (/.f32 ux maxCos) ux) (*.f32 ux ux)))) |
(/.f32 (-.f32 (*.f32 ux ux) (pow.f32 (/.f32 ux maxCos) #s(literal 2 binary32))) (+.f32 (/.f32 ux maxCos) ux)) |
(/.f32 (-.f32 (pow.f32 ux #s(literal 3 binary32)) (pow.f32 (/.f32 ux maxCos) #s(literal 3 binary32))) (+.f32 (pow.f32 (/.f32 ux maxCos) #s(literal 2 binary32)) (-.f32 (*.f32 ux ux) (*.f32 (/.f32 (neg.f32 ux) maxCos) ux)))) |
(/.f32 (-.f32 (pow.f32 ux #s(literal 3 binary32)) (pow.f32 (/.f32 ux maxCos) #s(literal 3 binary32))) (fma.f32 (/.f32 ux maxCos) (+.f32 (/.f32 ux maxCos) ux) (*.f32 ux ux))) |
(-.f32 (/.f32 (*.f32 ux ux) (+.f32 (/.f32 ux maxCos) ux)) (/.f32 (pow.f32 (/.f32 ux maxCos) #s(literal 2 binary32)) (+.f32 (/.f32 ux maxCos) ux))) |
(-.f32 (/.f32 (pow.f32 ux #s(literal 3 binary32)) (fma.f32 (/.f32 ux maxCos) (+.f32 (/.f32 ux maxCos) ux) (*.f32 ux ux))) (/.f32 (pow.f32 (/.f32 ux maxCos) #s(literal 3 binary32)) (fma.f32 (/.f32 ux maxCos) (+.f32 (/.f32 ux maxCos) ux) (*.f32 ux ux)))) |
(-.f32 ux (*.f32 (/.f32 (neg.f32 ux) maxCos) #s(literal -1 binary32))) |
(-.f32 ux (/.f32 ux maxCos)) |
(fma.f32 #s(literal -1 binary32) (/.f32 ux maxCos) ux) |
(fma.f32 (/.f32 ux maxCos) #s(literal -1 binary32) ux) |
(fma.f32 ux (/.f32 #s(literal -1 binary32) maxCos) ux) |
(+.f32 (/.f32 (pow.f32 ux #s(literal 3 binary32)) (fma.f32 (/.f32 ux maxCos) (+.f32 (/.f32 ux maxCos) ux) (*.f32 ux ux))) (/.f32 (pow.f32 (/.f32 ux maxCos) #s(literal 3 binary32)) (fma.f32 (/.f32 ux maxCos) (+.f32 (/.f32 ux maxCos) ux) (*.f32 ux ux)))) |
(+.f32 (/.f32 (neg.f32 ux) maxCos) ux) |
(+.f32 ux (/.f32 (neg.f32 ux) maxCos)) |
ux |
(*.f32 (/.f32 #s(literal -1 binary32) maxCos) (/.f32 ux #s(literal -1 binary32))) |
(*.f32 (/.f32 ux #s(literal -1 binary32)) (/.f32 #s(literal -1 binary32) maxCos)) |
(*.f32 #s(literal -1 binary32) (/.f32 (neg.f32 ux) maxCos)) |
(*.f32 (/.f32 #s(literal 1 binary32) maxCos) ux) |
(*.f32 (/.f32 ux maxCos) #s(literal 1 binary32)) |
(*.f32 ux (/.f32 #s(literal 1 binary32) maxCos)) |
(*.f32 #s(literal 1 binary32) (/.f32 ux maxCos)) |
(/.f32 (/.f32 (neg.f32 ux) #s(literal -1 binary32)) maxCos) |
(/.f32 (/.f32 (neg.f32 ux) maxCos) #s(literal -1 binary32)) |
(/.f32 (neg.f32 ux) (neg.f32 maxCos)) |
(/.f32 ux maxCos) |
(neg.f32 (/.f32 (neg.f32 ux) maxCos)) |
maxCos |
#s(literal 1 binary32) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(literal 1 binary32)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (fma.f32 (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) maxCos)) ux) maxCos #s(literal 1 binary32))) |
#s(approx (- ux (/ ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) maxCos)) ux)) |
#s(approx ux ux) |
#s(approx (/ ux maxCos) (/.f32 ux maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (+.f32 (expm1.f32 (neg.f32 (log.f32 ux))) maxCos) ux)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) maxCos)) ux) maxCos)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (fma.f32 (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) maxCos)) ux) maxCos #s(literal 1 binary32))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (neg.f32 ux) (-.f32 #s(literal 1 binary32) (+.f32 (/.f32 #s(literal 1 binary32) ux) maxCos)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 (*.f32 (neg.f32 ux) maxCos) (expm1.f32 (neg.f32 (log.f32 maxCos))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 (neg.f32 ux) (-.f32 (*.f32 (expm1.f32 (neg.f32 (log.f32 maxCos))) maxCos) (/.f32 #s(literal 1 binary32) ux)))) |
#s(approx (- ux (/ ux maxCos)) (*.f32 (neg.f32 ux) (expm1.f32 (neg.f32 (log.f32 maxCos))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) |
#s(approx (- ux (/ ux maxCos)) (/.f32 (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux) maxCos)) |
#s(approx maxCos maxCos) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (+.f32 (/.f32 (-.f32 #s(literal 1 binary32) ux) maxCos) ux) maxCos)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 maxCos ux)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 (+.f32 (/.f32 (-.f32 #s(literal 1 binary32) ux) maxCos) ux) maxCos)) |
#s(approx (- ux (/ ux maxCos)) ux) |
#s(approx (- ux (/ ux maxCos)) (-.f32 ux (/.f32 ux maxCos))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 (/.f32 (+.f32 #s(literal -1 binary32) ux) maxCos) ux) (neg.f32 maxCos))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 (-.f32 (/.f32 (+.f32 #s(literal -1 binary32) ux) maxCos) ux) (neg.f32 maxCos))) |
Compiled 1 827 to 296 computations (83.8% saved)
7 alts after pruning (2 fresh and 5 done)
| Pruned | Kept | Total | |
|---|---|---|---|
| New | 80 | 2 | 82 |
| Fresh | 0 | 0 | 0 |
| Picked | 1 | 0 | 1 |
| Done | 0 | 5 | 5 |
| Total | 81 | 7 | 88 |
| Status | Accuracy | Program |
|---|---|---|
| ✓ | 99.9% | (fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
| ✓ | 99.9% | (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
| ▶ | 97.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal 1 binary32))) |
| ✓ | 97.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
| ▶ | 17.1% | #s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
| ✓ | 9.3% | #s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
| ✓ | 70.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
Compiled 77 to 66 computations (14.3% saved)
| Inputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
(*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux) |
(-.f32 #s(literal 1 binary32) maxCos) |
#s(literal 1 binary32) |
maxCos |
ux |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal 1 binary32))) |
(fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal 1 binary32)) |
#s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) |
(/.f32 (neg.f32 ux) maxCos) |
(neg.f32 ux) |
| Outputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 1)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 (* ux (- 1 maxCos)))) |
#s(approx ux #s(hole binary32 ux)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 1)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (* maxCos (* ux (- 1 (/ 1 maxCos))))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* ux (- 1 (/ 1 maxCos))))) |
#s(approx (/ (neg ux) maxCos) #s(hole binary32 (* -1 (/ ux maxCos)))) |
#s(approx (neg ux) #s(hole binary32 (* -1 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos (* ux (- 1 (/ 1 maxCos)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* ux (+ (* maxCos (- 1 (/ 1 maxCos))) (/ 1 ux))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (+ 1 (* -1 maxCos)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (- (+ 1 (* -1 maxCos)) (/ 1 ux)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* maxCos (* ux (- (/ 1 maxCos) 1)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* ux (- (* maxCos (- (/ 1 maxCos) 1)) (/ 1 ux)))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* -1 (* ux (- (/ 1 maxCos) 1))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- 1 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- (+ 1 (* maxCos ux)) ux))) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 ux)) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 (+ ux (* -1 (* maxCos ux))))) |
#s(approx (- 1 maxCos) #s(hole binary32 1)) |
#s(approx (- 1 maxCos) #s(hole binary32 (+ 1 (* -1 maxCos)))) |
#s(approx maxCos #s(hole binary32 maxCos)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (* -1 ux)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (+ (* -1 ux) (* maxCos ux))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* -1 (/ ux maxCos)))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (/ (- (* maxCos ux) ux) maxCos))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 (* -1 (* maxCos ux)))) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 (* maxCos (+ (* -1 ux) (/ ux maxCos))))) |
#s(approx (- 1 maxCos) #s(hole binary32 (* -1 maxCos))) |
#s(approx (- 1 maxCos) #s(hole binary32 (* maxCos (- (/ 1 maxCos) 1)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 ux)) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (+ ux (* -1 (/ ux maxCos))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (- 1 ux) maxCos))))))) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 (* -1 (* maxCos (+ ux (* -1 (/ ux maxCos))))))) |
#s(approx (- 1 maxCos) #s(hole binary32 (* -1 (* maxCos (- 1 (/ 1 maxCos)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (+ 1 (* -1 ux)) maxCos))))))) |
9 calls:
| Time | Variable | Point | Expression | |
|---|---|---|---|---|
| 2.0ms | ux | @ | 0 | ((+ (- 1 ux) (* ux maxCos)) (* (- 1 maxCos) ux) (- 1 maxCos) 1 maxCos ux (+ (- 1 ux) (* ux maxCos)) (+ (* (- ux (/ ux maxCos)) maxCos) 1) (- ux (/ ux maxCos)) (/ (neg ux) maxCos) (neg ux)) |
| 1.0ms | ux | @ | -inf | ((+ (- 1 ux) (* ux maxCos)) (* (- 1 maxCos) ux) (- 1 maxCos) 1 maxCos ux (+ (- 1 ux) (* ux maxCos)) (+ (* (- ux (/ ux maxCos)) maxCos) 1) (- ux (/ ux maxCos)) (/ (neg ux) maxCos) (neg ux)) |
| 1.0ms | ux | @ | inf | ((+ (- 1 ux) (* ux maxCos)) (* (- 1 maxCos) ux) (- 1 maxCos) 1 maxCos ux (+ (- 1 ux) (* ux maxCos)) (+ (* (- ux (/ ux maxCos)) maxCos) 1) (- ux (/ ux maxCos)) (/ (neg ux) maxCos) (neg ux)) |
| 1.0ms | maxCos | @ | -inf | ((+ (- 1 ux) (* ux maxCos)) (* (- 1 maxCos) ux) (- 1 maxCos) 1 maxCos ux (+ (- 1 ux) (* ux maxCos)) (+ (* (- ux (/ ux maxCos)) maxCos) 1) (- ux (/ ux maxCos)) (/ (neg ux) maxCos) (neg ux)) |
| 1.0ms | maxCos | @ | inf | ((+ (- 1 ux) (* ux maxCos)) (* (- 1 maxCos) ux) (- 1 maxCos) 1 maxCos ux (+ (- 1 ux) (* ux maxCos)) (+ (* (- ux (/ ux maxCos)) maxCos) 1) (- ux (/ ux maxCos)) (/ (neg ux) maxCos) (neg ux)) |
Useful iterations: 0 (0.0ms)
| Iter | Nodes | Cost |
|---|---|---|
| 0 | 129 | 673 |
| 0 | 135 | 628 |
| 1 | 622 | 622 |
| 2 | 5304 | 622 |
| 0 | 8878 | 588 |
| 1× | iter limit |
| 1× | node limit |
| 1× | iter limit |
| Inputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
(*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux) |
(-.f32 #s(literal 1 binary32) maxCos) |
#s(literal 1 binary32) |
maxCos |
ux |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal 1 binary32))) |
(fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal 1 binary32)) |
#s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) |
(/.f32 (neg.f32 ux) maxCos) |
(neg.f32 ux) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 1)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (+ 1 (* ux (- maxCos 1))))) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 (* ux (- 1 maxCos)))) |
#s(approx ux #s(hole binary32 ux)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 1)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (* maxCos (* ux (- 1 (/ 1 maxCos))))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* ux (- 1 (/ 1 maxCos))))) |
#s(approx (/ (neg ux) maxCos) #s(hole binary32 (* -1 (/ ux maxCos)))) |
#s(approx (neg ux) #s(hole binary32 (* -1 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- maxCos 1)))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* ux (- (+ maxCos (/ 1 ux)) 1)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos (* ux (- 1 (/ 1 maxCos)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* ux (+ (* maxCos (- 1 (/ 1 maxCos))) (/ 1 ux))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (+ 1 (* -1 maxCos)))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* ux (- (+ 1 (* -1 maxCos)) (/ 1 ux)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* maxCos (* ux (- (/ 1 maxCos) 1)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* ux (- (* maxCos (- (/ 1 maxCos) 1)) (/ 1 ux)))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* -1 (* ux (- (/ 1 maxCos) 1))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- 1 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (- (+ 1 (* maxCos ux)) ux))) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 ux)) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 (+ ux (* -1 (* maxCos ux))))) |
#s(approx (- 1 maxCos) #s(hole binary32 1)) |
#s(approx (- 1 maxCos) #s(hole binary32 (+ 1 (* -1 maxCos)))) |
#s(approx maxCos #s(hole binary32 maxCos)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (* -1 ux)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (+ 1 (+ (* -1 ux) (* maxCos ux))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (* -1 (/ ux maxCos)))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (/ (- (* maxCos ux) ux) maxCos))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 (* -1 (* maxCos ux)))) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 (* maxCos (+ (* -1 ux) (/ ux maxCos))))) |
#s(approx (- 1 maxCos) #s(hole binary32 (* -1 maxCos))) |
#s(approx (- 1 maxCos) #s(hole binary32 (* maxCos (- (/ 1 maxCos) 1)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos ux))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* maxCos (- (+ ux (/ 1 maxCos)) (/ ux maxCos))))) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 ux)) |
#s(approx (- ux (/ ux maxCos)) #s(hole binary32 (+ ux (* -1 (/ ux maxCos))))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (- 1 ux) maxCos))))))) |
#s(approx (* (- 1 maxCos) ux) #s(hole binary32 (* -1 (* maxCos (+ ux (* -1 (/ ux maxCos))))))) |
#s(approx (- 1 maxCos) #s(hole binary32 (* -1 (* maxCos (- 1 (/ 1 maxCos)))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(hole binary32 (* -1 (* maxCos (+ (* -1 ux) (* -1 (/ (+ 1 (* -1 ux)) maxCos))))))) |
| Outputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
(*.f32 (*.f32 #s(literal 1 binary32) (-.f32 maxCos #s(literal 1 binary32))) ux) |
(*.f32 (*.f32 #s(literal -1 binary32) (-.f32 #s(literal 1 binary32) maxCos)) ux) |
(*.f32 (neg.f32 (-.f32 #s(literal 1 binary32) maxCos)) ux) |
(*.f32 (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux) #s(literal -1 binary32)) |
(*.f32 (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux) #s(literal 1 binary32)) |
(*.f32 (-.f32 #s(literal 1 binary32) maxCos) (neg.f32 ux)) |
(*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux) |
(*.f32 (neg.f32 ux) (-.f32 #s(literal 1 binary32) maxCos)) |
(*.f32 (neg.f32 ux) (-.f32 maxCos #s(literal 1 binary32))) |
(*.f32 #s(literal -1 binary32) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
(*.f32 (-.f32 maxCos #s(literal 1 binary32)) (neg.f32 ux)) |
(*.f32 (-.f32 maxCos #s(literal 1 binary32)) ux) |
(*.f32 ux (*.f32 #s(literal -1 binary32) (-.f32 maxCos #s(literal 1 binary32)))) |
(*.f32 ux (*.f32 (-.f32 #s(literal 1 binary32) maxCos) #s(literal -1 binary32))) |
(*.f32 ux (*.f32 #s(literal -1 binary32) (-.f32 #s(literal 1 binary32) maxCos))) |
(*.f32 ux (-.f32 #s(literal -1 binary32) (neg.f32 maxCos))) |
(*.f32 ux (neg.f32 (-.f32 #s(literal 1 binary32) maxCos))) |
(*.f32 ux (-.f32 #s(literal 1 binary32) maxCos)) |
(*.f32 ux (-.f32 maxCos #s(literal 1 binary32))) |
(*.f32 #s(literal 1 binary32) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
(/.f32 (*.f32 (fma.f32 maxCos maxCos #s(literal -1 binary32)) ux) (-.f32 maxCos #s(literal -1 binary32))) |
(/.f32 (*.f32 (-.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32)) ux) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (*.f32 (neg.f32 ux) (fma.f32 maxCos maxCos #s(literal -1 binary32))) (-.f32 maxCos #s(literal -1 binary32))) |
(/.f32 (*.f32 (neg.f32 ux) (-.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32))) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (*.f32 ux (-.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos))) (-.f32 maxCos #s(literal -1 binary32))) |
(/.f32 (*.f32 ux (-.f32 #s(literal 1 binary32) (pow.f32 maxCos #s(literal 3 binary32)))) (fma.f32 maxCos (-.f32 maxCos #s(literal -1 binary32)) #s(literal 1 binary32))) |
(/.f32 (*.f32 #s(literal 1 binary32) (-.f32 (*.f32 ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)))) (fma.f32 maxCos ux ux)) |
(/.f32 (*.f32 #s(literal 1 binary32) (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32)))) (fma.f32 (*.f32 maxCos ux) (-.f32 (*.f32 maxCos ux) (neg.f32 ux)) (*.f32 ux ux))) |
(/.f32 (*.f32 ux (fma.f32 maxCos maxCos #s(literal -1 binary32))) (-.f32 maxCos #s(literal -1 binary32))) |
(/.f32 (*.f32 ux (-.f32 (pow.f32 maxCos #s(literal 3 binary32)) #s(literal 1 binary32))) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (*.f32 (neg.f32 ux) (-.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos))) (-.f32 maxCos #s(literal -1 binary32))) |
(/.f32 (*.f32 (neg.f32 ux) (-.f32 #s(literal 1 binary32) (pow.f32 maxCos #s(literal 3 binary32)))) (fma.f32 maxCos (-.f32 maxCos #s(literal -1 binary32)) #s(literal 1 binary32))) |
(/.f32 (-.f32 (pow.f32 ux #s(literal 3 binary32)) (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32))) (fma.f32 (*.f32 maxCos ux) (-.f32 (*.f32 maxCos ux) (neg.f32 ux)) (*.f32 ux ux))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux ux))) (neg.f32 (fma.f32 maxCos ux ux))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux ux))) (fma.f32 maxCos ux ux)) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32)))) (neg.f32 (fma.f32 ux (fma.f32 maxCos ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32)))) (fma.f32 ux (fma.f32 maxCos ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)))) |
(/.f32 (neg.f32 (-.f32 (*.f32 ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)))) (neg.f32 (fma.f32 maxCos ux ux))) |
(/.f32 (neg.f32 (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32)))) (neg.f32 (fma.f32 (*.f32 maxCos ux) (-.f32 (*.f32 maxCos ux) (neg.f32 ux)) (*.f32 ux ux)))) |
(/.f32 (*.f32 (-.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) ux) (-.f32 maxCos #s(literal -1 binary32))) |
(/.f32 (*.f32 (-.f32 #s(literal 1 binary32) (pow.f32 maxCos #s(literal 3 binary32))) ux) (fma.f32 maxCos (-.f32 maxCos #s(literal -1 binary32)) #s(literal 1 binary32))) |
(/.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux ux)) (-.f32 (*.f32 maxCos ux) (neg.f32 ux))) |
(/.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux ux)) (-.f32 (*.f32 (neg.f32 maxCos) ux) ux)) |
(/.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux ux)) (neg.f32 (fma.f32 maxCos ux ux))) |
(/.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (*.f32 ux ux)) (fma.f32 maxCos ux ux)) |
(/.f32 (-.f32 (*.f32 ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))) (fma.f32 maxCos ux ux)) |
(/.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32))) (neg.f32 (fma.f32 ux (fma.f32 maxCos ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))))) |
(/.f32 (-.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32))) (fma.f32 ux (fma.f32 maxCos ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)))) |
(/.f32 (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32))) (fma.f32 ux (fma.f32 maxCos ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)))) |
(/.f32 (+.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (pow.f32 ux #s(literal 3 binary32))) (fma.f32 (*.f32 maxCos ux) (-.f32 (*.f32 maxCos ux) (neg.f32 ux)) (*.f32 ux ux))) |
(-.f32 (/.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (fma.f32 maxCos ux ux)) (/.f32 (*.f32 ux ux) (fma.f32 maxCos ux ux))) |
(-.f32 (/.f32 (*.f32 ux ux) (fma.f32 maxCos ux ux)) (/.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)) (fma.f32 maxCos ux ux))) |
(-.f32 (/.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (fma.f32 ux (fma.f32 maxCos ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32)))) (/.f32 (pow.f32 ux #s(literal 3 binary32)) (fma.f32 ux (fma.f32 maxCos ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))))) |
(-.f32 (*.f32 maxCos ux) ux) |
(-.f32 (neg.f32 ux) (*.f32 (neg.f32 maxCos) ux)) |
(-.f32 ux (*.f32 (neg.f32 ux) (neg.f32 maxCos))) |
(-.f32 ux (*.f32 (*.f32 (neg.f32 maxCos) ux) #s(literal -1 binary32))) |
(-.f32 ux (*.f32 maxCos ux)) |
(fma.f32 (*.f32 maxCos ux) #s(literal -1 binary32) ux) |
(fma.f32 (*.f32 maxCos ux) #s(literal 1 binary32) (neg.f32 ux)) |
(fma.f32 (neg.f32 maxCos) (neg.f32 ux) (neg.f32 ux)) |
(fma.f32 (neg.f32 maxCos) ux ux) |
(fma.f32 (neg.f32 ux) (neg.f32 maxCos) (neg.f32 ux)) |
(fma.f32 (neg.f32 ux) maxCos ux) |
(fma.f32 (neg.f32 ux) #s(literal 1 binary32) (*.f32 #s(literal -1 binary32) (*.f32 (neg.f32 maxCos) ux))) |
(fma.f32 (neg.f32 ux) #s(literal 1 binary32) (*.f32 (neg.f32 ux) (neg.f32 maxCos))) |
(fma.f32 (neg.f32 ux) #s(literal 1 binary32) (*.f32 (*.f32 (neg.f32 maxCos) ux) #s(literal -1 binary32))) |
(fma.f32 (neg.f32 ux) #s(literal 1 binary32) (*.f32 (neg.f32 maxCos) (neg.f32 ux))) |
(fma.f32 (neg.f32 ux) #s(literal 1 binary32) (*.f32 maxCos ux)) |
(fma.f32 #s(literal -1 binary32) (*.f32 maxCos ux) ux) |
(fma.f32 #s(literal -1 binary32) ux (*.f32 #s(literal -1 binary32) (*.f32 (neg.f32 maxCos) ux))) |
(fma.f32 #s(literal -1 binary32) ux (*.f32 (neg.f32 ux) (neg.f32 maxCos))) |
(fma.f32 #s(literal -1 binary32) ux (*.f32 (*.f32 (neg.f32 maxCos) ux) #s(literal -1 binary32))) |
(fma.f32 #s(literal -1 binary32) ux (*.f32 (neg.f32 maxCos) (neg.f32 ux))) |
(fma.f32 #s(literal -1 binary32) ux (*.f32 maxCos ux)) |
(fma.f32 maxCos (neg.f32 ux) ux) |
(fma.f32 maxCos ux (neg.f32 ux)) |
(fma.f32 ux (neg.f32 maxCos) ux) |
(fma.f32 ux #s(literal -1 binary32) (*.f32 #s(literal -1 binary32) (*.f32 (neg.f32 maxCos) ux))) |
(fma.f32 ux #s(literal -1 binary32) (*.f32 (neg.f32 ux) (neg.f32 maxCos))) |
(fma.f32 ux #s(literal -1 binary32) (*.f32 (*.f32 (neg.f32 maxCos) ux) #s(literal -1 binary32))) |
(fma.f32 ux #s(literal -1 binary32) (*.f32 (neg.f32 maxCos) (neg.f32 ux))) |
(fma.f32 ux #s(literal -1 binary32) (*.f32 maxCos ux)) |
(fma.f32 ux maxCos (neg.f32 ux)) |
(fma.f32 #s(literal 1 binary32) (*.f32 maxCos ux) (neg.f32 ux)) |
(fma.f32 #s(literal 1 binary32) (neg.f32 ux) (*.f32 #s(literal -1 binary32) (*.f32 (neg.f32 maxCos) ux))) |
(fma.f32 #s(literal 1 binary32) (neg.f32 ux) (*.f32 (neg.f32 ux) (neg.f32 maxCos))) |
(fma.f32 #s(literal 1 binary32) (neg.f32 ux) (*.f32 (*.f32 (neg.f32 maxCos) ux) #s(literal -1 binary32))) |
(fma.f32 #s(literal 1 binary32) (neg.f32 ux) (*.f32 (neg.f32 maxCos) (neg.f32 ux))) |
(fma.f32 #s(literal 1 binary32) (neg.f32 ux) (*.f32 maxCos ux)) |
(+.f32 (*.f32 (neg.f32 ux) (neg.f32 maxCos)) (neg.f32 ux)) |
(+.f32 (/.f32 (pow.f32 ux #s(literal 3 binary32)) (fma.f32 (*.f32 maxCos ux) (-.f32 (*.f32 maxCos ux) (neg.f32 ux)) (*.f32 ux ux))) (/.f32 (pow.f32 (*.f32 maxCos ux) #s(literal 3 binary32)) (fma.f32 (*.f32 maxCos ux) (-.f32 (*.f32 maxCos ux) (neg.f32 ux)) (*.f32 ux ux)))) |
(+.f32 (*.f32 (neg.f32 maxCos) (neg.f32 ux)) (neg.f32 ux)) |
(+.f32 (*.f32 (neg.f32 maxCos) ux) ux) |
(+.f32 (*.f32 maxCos ux) (neg.f32 ux)) |
(+.f32 (neg.f32 ux) (*.f32 #s(literal -1 binary32) (*.f32 (neg.f32 maxCos) ux))) |
(+.f32 (neg.f32 ux) (*.f32 (neg.f32 ux) (neg.f32 maxCos))) |
(+.f32 (neg.f32 ux) (*.f32 (*.f32 (neg.f32 maxCos) ux) #s(literal -1 binary32))) |
(+.f32 (neg.f32 ux) (*.f32 (neg.f32 maxCos) (neg.f32 ux))) |
(+.f32 (neg.f32 ux) (*.f32 maxCos ux)) |
(+.f32 ux (*.f32 (neg.f32 maxCos) ux)) |
(neg.f32 (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
(*.f32 #s(literal 1 binary32) (-.f32 #s(literal 1 binary32) maxCos)) |
(/.f32 (neg.f32 (-.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos))) (neg.f32 (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (neg.f32 (-.f32 #s(literal 1 binary32) (pow.f32 maxCos #s(literal 3 binary32)))) (neg.f32 (fma.f32 maxCos (-.f32 maxCos #s(literal -1 binary32)) #s(literal 1 binary32)))) |
(/.f32 (fma.f32 maxCos maxCos #s(literal -1 binary32)) (-.f32 (neg.f32 maxCos) #s(literal 1 binary32))) |
(/.f32 (-.f32 #s(literal 1 binary32) (*.f32 maxCos maxCos)) (-.f32 maxCos #s(literal -1 binary32))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 maxCos #s(literal 3 binary32))) (fma.f32 maxCos maxCos (-.f32 maxCos #s(literal -1 binary32)))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 maxCos #s(literal 3 binary32))) (fma.f32 maxCos (-.f32 maxCos #s(literal -1 binary32)) #s(literal 1 binary32))) |
(-.f32 (/.f32 #s(literal 1 binary32) (fma.f32 maxCos (-.f32 maxCos #s(literal -1 binary32)) #s(literal 1 binary32))) (/.f32 (pow.f32 maxCos #s(literal 3 binary32)) (fma.f32 maxCos (-.f32 maxCos #s(literal -1 binary32)) #s(literal 1 binary32)))) |
(-.f32 (/.f32 #s(literal 1 binary32) (-.f32 maxCos #s(literal -1 binary32))) (/.f32 (*.f32 maxCos maxCos) (-.f32 maxCos #s(literal -1 binary32)))) |
(-.f32 (neg.f32 maxCos) #s(literal -1 binary32)) |
(-.f32 #s(literal 1 binary32) (*.f32 (neg.f32 maxCos) #s(literal -1 binary32))) |
(-.f32 #s(literal 1 binary32) maxCos) |
(fma.f32 (neg.f32 maxCos) #s(literal 1 binary32) #s(literal 1 binary32)) |
(fma.f32 #s(literal -1 binary32) maxCos #s(literal 1 binary32)) |
(fma.f32 maxCos #s(literal -1 binary32) #s(literal 1 binary32)) |
(fma.f32 #s(literal 1 binary32) (neg.f32 maxCos) #s(literal 1 binary32)) |
(+.f32 (/.f32 #s(literal 1 binary32) (fma.f32 maxCos (-.f32 maxCos #s(literal -1 binary32)) #s(literal 1 binary32))) (/.f32 (pow.f32 maxCos #s(literal 3 binary32)) (fma.f32 maxCos (-.f32 maxCos #s(literal -1 binary32)) #s(literal 1 binary32)))) |
(+.f32 (neg.f32 maxCos) #s(literal 1 binary32)) |
(+.f32 #s(literal 1 binary32) (neg.f32 maxCos)) |
(neg.f32 (-.f32 maxCos #s(literal 1 binary32))) |
#s(literal 1 binary32) |
maxCos |
ux |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal 1 binary32))) |
(/.f32 (-.f32 #s(literal 1 binary32) (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 2 binary32))) (-.f32 #s(literal 1 binary32) (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 2 binary32)) #s(literal 1 binary32))) (neg.f32 (fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal -1 binary32)))) |
(/.f32 (neg.f32 (-.f32 (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 3 binary32)) #s(literal -1 binary32))) (neg.f32 (+.f32 (-.f32 #s(literal 1 binary32) (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos)) (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 2 binary32))))) |
(/.f32 (-.f32 (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 2 binary32)) #s(literal 1 binary32)) (fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal -1 binary32))) |
(/.f32 (-.f32 (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 3 binary32)) #s(literal -1 binary32)) (+.f32 #s(literal 1 binary32) (-.f32 (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 2 binary32)) (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos)))) |
(/.f32 (-.f32 (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 3 binary32)) #s(literal -1 binary32)) (+.f32 (-.f32 #s(literal 1 binary32) (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos)) (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 2 binary32)))) |
(-.f32 (/.f32 (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 2 binary32)) (fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal -1 binary32))) (/.f32 #s(literal 1 binary32) (fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal -1 binary32)))) |
(-.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal -1 binary32)) |
(-.f32 #s(literal 1 binary32) (*.f32 (neg.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos))) maxCos)) |
(-.f32 #s(literal 1 binary32) (*.f32 (neg.f32 maxCos) #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)))) |
(fma.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 1 binary32) #s(literal 1 binary32)) |
(fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal 1 binary32)) |
(fma.f32 maxCos (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) #s(literal 1 binary32)) #s(literal 1 binary32)) |
(fma.f32 maxCos #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) #s(literal 1 binary32)) |
(fma.f32 #s(literal 1 binary32) (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 1 binary32)) |
(+.f32 (/.f32 (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 3 binary32)) (+.f32 (-.f32 #s(literal 1 binary32) (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos)) (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 2 binary32)))) (/.f32 #s(literal 1 binary32) (+.f32 (-.f32 #s(literal 1 binary32) (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos)) (pow.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 2 binary32))))) |
(+.f32 (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos) #s(literal 1 binary32)) |
(+.f32 #s(literal 1 binary32) (*.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos)) |
#s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) |
(*.f32 #s(literal -1 binary32) (/.f32 ux maxCos)) |
(*.f32 (/.f32 ux maxCos) #s(literal -1 binary32)) |
(*.f32 ux (/.f32 #s(literal -1 binary32) maxCos)) |
(/.f32 (/.f32 ux #s(literal -1 binary32)) maxCos) |
(/.f32 (neg.f32 ux) maxCos) |
(/.f32 (/.f32 ux maxCos) #s(literal -1 binary32)) |
(/.f32 ux (neg.f32 maxCos)) |
(neg.f32 (/.f32 ux maxCos)) |
(*.f32 (neg.f32 ux) #s(literal 1 binary32)) |
(*.f32 #s(literal -1 binary32) ux) |
(*.f32 ux #s(literal -1 binary32)) |
(*.f32 #s(literal 1 binary32) (neg.f32 ux)) |
(neg.f32 ux) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (* (- 1 maxCos) ux) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
#s(approx ux ux) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) #s(literal 1 binary32)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (fma.f32 (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) maxCos)) ux) maxCos #s(literal 1 binary32))) |
#s(approx (- ux (/ ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) maxCos)) ux)) |
#s(approx (/ (neg ux) maxCos) (/.f32 (neg.f32 ux) maxCos)) |
#s(approx (neg ux) (neg.f32 ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (+.f32 (expm1.f32 (neg.f32 (log.f32 ux))) maxCos) ux)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) maxCos)) ux) maxCos)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (fma.f32 (*.f32 (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) maxCos)) ux) maxCos #s(literal 1 binary32))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) (+.f32 (/.f32 #s(literal 1 binary32) ux) maxCos)) (neg.f32 ux))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 (*.f32 (neg.f32 maxCos) ux) (expm1.f32 (neg.f32 (log.f32 maxCos))))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 (-.f32 (*.f32 (expm1.f32 (neg.f32 (log.f32 maxCos))) maxCos) (/.f32 #s(literal 1 binary32) ux)) (neg.f32 ux))) |
#s(approx (- ux (/ ux maxCos)) (*.f32 (expm1.f32 (neg.f32 (log.f32 maxCos))) (neg.f32 ux))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (* (- 1 maxCos) ux) ux) |
#s(approx (* (- 1 maxCos) ux) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
#s(approx (- 1 maxCos) #s(literal 1 binary32)) |
#s(approx (- 1 maxCos) (-.f32 #s(literal 1 binary32) maxCos)) |
#s(approx maxCos maxCos) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (fma.f32 maxCos ux (-.f32 #s(literal 1 binary32) ux))) |
#s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) |
#s(approx (- ux (/ ux maxCos)) (/.f32 (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux) maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (+.f32 (/.f32 (-.f32 #s(literal 1 binary32) ux) maxCos) ux) maxCos)) |
#s(approx (* (- 1 maxCos) ux) (*.f32 (neg.f32 maxCos) ux)) |
#s(approx (* (- 1 maxCos) ux) (*.f32 (-.f32 (/.f32 ux maxCos) ux) maxCos)) |
#s(approx (- 1 maxCos) (neg.f32 maxCos)) |
#s(approx (- 1 maxCos) (*.f32 (expm1.f32 (neg.f32 (log.f32 maxCos))) maxCos)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 maxCos ux)) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 (+.f32 (/.f32 (-.f32 #s(literal 1 binary32) ux) maxCos) ux) maxCos)) |
#s(approx (- ux (/ ux maxCos)) ux) |
#s(approx (- ux (/ ux maxCos)) (-.f32 (/.f32 ux maxCos) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (+.f32 (/.f32 (-.f32 #s(literal 1 binary32) ux) maxCos) ux) maxCos)) |
#s(approx (* (- 1 maxCos) ux) (*.f32 (neg.f32 maxCos) (-.f32 (/.f32 ux maxCos) ux))) |
#s(approx (- 1 maxCos) (*.f32 (neg.f32 maxCos) (-.f32 #s(literal 1 binary32) (/.f32 #s(literal 1 binary32) maxCos)))) |
#s(approx (+ (* (- ux (/ ux maxCos)) maxCos) 1) (*.f32 (+.f32 (/.f32 (-.f32 #s(literal 1 binary32) ux) maxCos) ux) maxCos)) |
Compiled 4 130 to 592 computations (85.7% saved)
8 alts after pruning (2 fresh and 6 done)
| Pruned | Kept | Total | |
|---|---|---|---|
| New | 199 | 2 | 201 |
| Fresh | 0 | 0 | 0 |
| Picked | 1 | 1 | 2 |
| Done | 0 | 5 | 5 |
| Total | 200 | 8 | 208 |
| Status | Accuracy | Program |
|---|---|---|
| ✓ | 99.9% | (fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
| ✓ | 99.9% | (fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
| ✓ | 97.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal 1 binary32))) |
| 17.1% | #s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 ux (*.f32 maxCos ux))) | |
| ✓ | 97.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
| ✓ | 9.3% | #s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
| 17.1% | #s(approx (+ (- 1 ux) (* ux maxCos)) #s(approx (* (- 1 maxCos) ux) ux)) | |
| ✓ | 70.8% | #s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
Compiled 265 to 128 computations (51.7% saved)
| Inputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(approx (* (- 1 maxCos) ux) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 ux (*.f32 maxCos ux))) |
(fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
(+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 #s(approx (- ux (/ ux maxCos)) (/.f32 (neg.f32 ux) maxCos)) maxCos #s(literal 1 binary32))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (fma.f32 (-.f32 ux (/.f32 ux maxCos)) maxCos #s(literal 1 binary32))) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) (+.f32 (/.f32 #s(literal 1 binary32) ux) maxCos)) (neg.f32 ux))) |
(/.f32 (-.f32 (*.f32 #s(literal 2 binary32) (+.f32 ux (*.f32 maxCos ux))) (*.f32 #s(literal 2 binary32) (-.f32 (*.f32 ux ux) (pow.f32 (*.f32 maxCos ux) #s(literal 2 binary32))))) (*.f32 #s(literal 2 binary32) (+.f32 ux (*.f32 maxCos ux)))) |
| Outputs |
|---|
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
4 calls:
| 5.0ms | ux |
| 4.0ms | (+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
| 4.0ms | maxCos |
| 4.0ms | uy |
| Accuracy | Segments | Branch |
|---|---|---|
| 99.9% | 1 | (+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
| 99.9% | 1 | ux |
| 99.9% | 1 | uy |
| 99.9% | 1 | maxCos |
Compiled 10 to 16 computations (-60% saved)
| Inputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(approx (* (- 1 maxCos) ux) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 ux (*.f32 maxCos ux))) |
(fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
| Outputs |
|---|
(fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
4 calls:
| 2.0ms | uy |
| 2.0ms | ux |
| 2.0ms | maxCos |
| 2.0ms | (+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
| Accuracy | Segments | Branch |
|---|---|---|
| 99.9% | 1 | (+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
| 99.9% | 1 | ux |
| 99.9% | 1 | uy |
| 99.9% | 1 | maxCos |
Compiled 10 to 16 computations (-60% saved)
| Inputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(approx (* (- 1 maxCos) ux) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 maxCos ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (*.f32 (-.f32 #s(literal 1 binary32) maxCos) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 ux (*.f32 maxCos ux))) |
| Outputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
4 calls:
| 58.0ms | uy |
| 2.0ms | ux |
| 2.0ms | maxCos |
| 2.0ms | (+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
| Accuracy | Segments | Branch |
|---|---|---|
| 97.8% | 1 | (+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
| 97.8% | 1 | ux |
| 97.8% | 1 | uy |
| 97.8% | 1 | maxCos |
Compiled 10 to 16 computations (-60% saved)
Total -17.3b remaining (-184.8%)
Threshold costs -17.3b (-184.8%)
| Inputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(approx (* (- 1 maxCos) ux) ux)) |
| Outputs |
|---|
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
4 calls:
| 1.0ms | (+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
| 1.0ms | maxCos |
| 1.0ms | uy |
| 1.0ms | ux |
| Accuracy | Segments | Branch |
|---|---|---|
| 70.8% | 1 | (+.f32 (-.f32 #s(literal 1 binary32) ux) (*.f32 ux maxCos)) |
| 70.8% | 1 | uy |
| 70.8% | 1 | maxCos |
| 70.8% | 1 | ux |
Compiled 10 to 16 computations (-60% saved)
Useful iterations: 0 (0.0ms)
| Iter | Nodes | Cost |
|---|---|---|
| 0 | 12 | 32 |
| 1 | 25 | 32 |
| 2 | 50 | 32 |
| 3 | 89 | 32 |
| 4 | 174 | 32 |
| 5 | 558 | 32 |
| 6 | 4615 | 32 |
| 1× | node limit |
| Inputs |
|---|
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
(fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
| Outputs |
|---|
(fma.f32 (-.f32 maxCos #s(literal 1 binary32)) ux #s(literal 1 binary32)) |
(fma.f32 ux maxCos (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) (-.f32 #s(literal 1 binary32) ux)) |
#s(approx (+ (- 1 ux) (* ux maxCos)) #s(literal 1 binary32)) |
| 1× | fuel |
Compiled 32 to 14 computations (56.3% saved)
(abs uy)
Compiled 90 to 54 computations (40% saved)
Loading profile data...